World Jaguar Logistics co. serves below industry project:

We are capable to handle:

Just name a few …

Project Break Bulk Cargo Logistics is one of World Jaguar Logistics company’s core business products. Project Logistics Division’s scope of works include transport of large domestic projects as well as international projects, involving multimodal transportation, chartering, packing, warehousing, port transferring, custom declaration , insurance and consultancy etc.

In recent years, Project Logistics Division has engaged in many large projects both in and out of China, forming an operating network capable of reaching hundreds of destinations worldwide. Project Logistics Division’s competitive advantages lie in industries of renewable energy, oil & gas, rail, infrastructure, power, mining etc

Our Project Cargo team has a wealth of local, practical expertise with strict handling standards which enables us to provide comprehensive, professional and customized solutions to our clients.

Multiple Modes of Transportation:

Regardless of commodity size, weight, or configuration, we can propose the most suitable solution by combing multiple modes from end-to-end, complete with full visibility: Conventional vessel; RORO vessel; Container break bulk loading, including oversized containers; Air freight; Air and marine Charter; Inland water transport by barge; Costal marine transportation; Land transportation of ultra-heavy cargo by multi axel modular trailer.

Project Logistics Management:

We offer integrated logistics planning around the globe , using control tower methodology, with complete visibility: Full turnkey base factory relocation logistics; Project planning and project management; Overall logistics control, right down to mobilizing and monitoring on-site teams; Vendor management, where we have special expertise on renewable Energy sectors, oil & gas, EPC etc.; Delivery and on-site erection; 

Value added service:

When required, we can provide all the supplementary value-added support, tailored into a fully integrated service, such as Consulting and total logistics planning; Road survey and feasibility study; Site supervision; IT solutions, including progress visibility, supported with full Key Performance Indicators

Highlights of our service for project shipment:

·         Professional Lashing worker & Driver & Other labor

·         Work site safety matters

·         Planning working schedule

·         Reporting procedure to Customer

·         Receiving and feedback

·         Dealing with technical problem

·         Finding best logistic way

·         Dealing relationship with transportation department

·         Dealing matter of Police

·         Dealing with Import department

·         Getting permit


Power case:

Case 1 Study: Project name: Rwanda 220/30kv Bugesera-shango substations



Project name: Rwanda 220/30kv Bugesera-shango substations

Cargo volume: Total 1100 wm by break bulk and 26*40HQ+2*40OT depart to 5 batches.

Final destination : area 50km around Kigali in Rwanda .

1st batch: 200 wm steel constructions by break bulk from Tianjin/Shanghai China to Dar es salaam/Mombasa. ETD: July 2019.

2nd batch: main equipment by 20*40HQ from Shanghai China to Dar es salaam. ETD: August 2019.

3rd batch:900 wm voltage transformer and reactor by break bulk from Tianjin /Shanghai China to Dar es salaam/Mombasa. ETD: October 2019.

     4*40HQ+2*40OT main equipment from Shanghai to Dar es salaam. ETD:October 2019

     40OT dimension: 11.8*2.1*4.2m、20 tons per 40OT

     Transformer dimension: 6000MM*2600MM*3300mm/50tons  total 1 package.

     Reactor dimension:5600MM*2900MM*3200MM/35tons each total 2 package

4th batch: other accessory and equipment by 2*40HQ from Shanghai China to Dar es salaam.. ETD: October 2019

our work scope: 

pre-carriage from factory to Chinese sea ports

customs clarence at origin

booking with carrier a

arrange ocean transportation on carrier

lashing and handling at ports

Road survey

Accept the cargo at Dar es salaam and Mombasa including break bulk and container

Custom clearance at Dar es salaam and Mombasa including break bulk and container

Border clearance 

transportation from Dar es salaam and Mombasa to the jobsite

skidding and positioning transformer

Pls contact : [email protected]


Infrastructure case:

Case 1 Study: Project name: China to Mabayo, Bataan in Philippine:



Project name: Heavy Euqipment moving from Guangzhou China to Mabayo, Bataan in Philippine:

POL/POD: GuangZhou port in China to Mabayo, Bataan in Philippine via Subic port

volume:1000wm breakbulk cargo + 360x40GP/HQ+240x20GP+5x20OT+5x40OT+2x20FR+2x40FR

cargo description:Breakbulk cargo is steel structure and infrastructure goods ; container shipment is electronic equipment and wiring

Work of scope :

booking with carrier at origin

arrange ocean transportation on carrier

loading and fixing the cargo in container 

Lashing and fixing the cargo  on breakbulk carrier 

Accept the cargo at Subic bay port  including break bulk and container

Custom clearance at Philippine

transportation from Subic port to jobsite at Mabayo, Bataan in Philippine

find warehouse to store the cargo in Subic port area 

offloading the cargo at jobsite with forklift and crane 

coordinate with carrier to arrange SOC return to China and COC return to nominated depot

Pls contact : [email protected]


Power case2:





Project name: India 220/132kv Jakkanpur Substations :

POL/POD: QingDao China to Kolkatta,India.

volume:1100wm breakbulk cargo + 26x40GP/HQ+10x40OT

cargo description:transformer , packages associated with strengthing of transmission system etc.

Work of scope :

booking with carrier at origin

arrange ocean transportation on carrier

cargo precarriage from factory to port of loading

loading and fixing the cargo in container 

Lashing and fixing the cargo  on breakbulk carrier 

Accept the cargo at Kolkatta India  including break bulk and container

unloading from container and carrier 

Pls contact : [email protected]


Oil gas case:




PROJECT:  Pipes to Saudi Arabia

SCOPE:From Tianjin, China to Saudi Arabia

VOLUME:35,000 FRT

Renewable energy case:




PROJECT:Blades, towers, hubs… 

SCOPE:Door to Door from China to South Africa

VOLUME:220,000 FRT


Rail case:



PROJECT: 8 locomotives 

SCOPE:From France to Tianjin, China


Mining case:


PROJECT: 3 Ball Mill Shells, 2 Gear heads and  accessories

Scope:On and off-shore freight forwarding.  Pickup address in China located approx  1,600 km of distance from Port of  Loading

内蒙古11选5助手